Home | History | Annotate | Download | only in content

Lines Matching full:schedule

525             delay = -1; // this means schedule at the front of the queue
754 * Create and schedule a SyncOperation.
756 * @param syncOperation the SyncOperation to schedule
825 // If this was an upward sync then schedule a two-way sync immediately.
1527 // if it is ready to run then schedule it and mark it as having been scheduled
1576 // no need to schedule an alarm, as that will be done by our caller.
1711 // no need to schedule an alarm, as that will be done by our caller.
1820 // no need to schedule an alarm, as that will be done by our caller.