Home | History | Annotate | Download | only in diffserv

Lines Matching full:metering

26 	*observe that the metering/policing works correctly (and the marking
34 *observe that the metering/policing works correctly (and the marking
37 Metering: The data throughput should not exceed 2*CIR1 + 2*CIR2
53 Metering: Allocated throughput should not exceed 2*CIR1 + 2*CIR2
58 Metering: Allocated throughput should not exceed CIR1 + 2*CIR2
63 Metering: Allocated throughput should not exceed CIR1 + CIR2
68 Metering: Allocated throughput should not exceed CIR1
80 *observe that the metering/policing works correctly (and the marking
83 Metering:
105 Metering: Allocated throughput should not exceed 2*CIR1 + 2*CIR2
110 Metering: Allocated throughput should not exceed CIR1 + 2*CIR2
115 Metering: Allocated throughput should not exceed PIR1+ CIR1 + CIR2
120 Metering: Allocated throughput should not exceed CIR1