Home | History | Annotate | Download | only in resources

Lines Matching refs:ScheduleTasks

230   raster_worker_pool_->ScheduleTasks(&empty);
308 ScheduleTasks(tiles_that_need_to_be_rasterized);
498 // to ScheduleTasks() to prevent canceled tasks from being scheduled.
511 ScheduleTasks(tiles_that_need_to_be_rasterized);
797 void TileManager::ScheduleTasks(
799 TRACE_EVENT1("cc", "TileManager::ScheduleTasks",
825 // ScheduleTasks to prevent usage from rising above limits.
831 raster_worker_pool_->ScheduleTasks(&tasks);