Lines Matching refs:phase
2 * auth.c - PPP authentication and phase control.
199 and we are proceeding to the network phase. */
528 * An Open on LCP has requested a change from Dead to Establish phase.
587 * LCP has terminated the link; go to the Dead phase and take the
594 if (phase == PHASE_DEAD || phase == PHASE_MASTER)
673 if (phase != PHASE_DEAD && phase != PHASE_MASTER)
699 * Proceed to the Dead, Authenticate or Network phase as appropriate.
779 * Proceed to the network phase.
954 * proceed to the network (or callback) phase.
1023 * proceed to the network (or callback) phase.