Lines Matching full:scheduled
140 // schedulable. If all the uses of a node have been scheduled, then the node
141 // itself can be scheduled.
265 // single-exit region that makes up a minimal component to be scheduled.
1151 // Make sure root nodes are scheduled in their respective blocks.
1185 // node's uses are scheduled before the node itself.
1360 // Don't schedule nodes that are already scheduled.
1365 // the latest block that this node can be scheduled in.