Home | History | Annotate | Download | only in async
      1 /*
      2  * Copyright (C) 2016 The Android Open Source Project
      3  *
      4  * Licensed under the Apache License, Version 2.0 (the "License");
      5  * you may not use this file except in compliance with the License.
      6  * You may obtain a copy of the License at
      7  *
      8  *      http://www.apache.org/licenses/LICENSE-2.0
      9  *
     10  * Unless required by applicable law or agreed to in writing, software
     11  * distributed under the License is distributed on an "AS IS" BASIS,
     12  * WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
     13  * See the License for the specific language governing permissions and
     14  * limitations under the License.
     15  */
     16 
     17 package com.android.incallui.async;
     18 
     19 import com.android.contacts.common.testing.NeededForTesting;
     20 
     21 import java.util.concurrent.Executor;
     22 
     23 /**
     24  * Executor that can be used to easily synchronize testing and production code. Production code
     25  * should call {@link #milestone()} at points in the code where the state of the system is worthy of
     26  * testing. In a test scenario, this method will pause execution until the test acknowledges the
     27  * milestone through the use of {@link #ackMilestoneForTesting()}.
     28  */
     29 public interface PausableExecutor extends Executor {
     30 
     31     /**
     32      * Method called from asynchronous production code to inform this executor that it has
     33      * reached a point that puts the system into a state worth testing. TestableExecutors intended
     34      * for use in a testing environment should cause the calling thread to block. In the production
     35      * environment this should be a no-op.
     36      */
     37     void milestone();
     38 
     39     /**
     40      * Method called from the test code to inform this executor that the state of the production
     41      * system at the current milestone has been sufficiently tested. Every milestone must be
     42      * acknowledged.
     43      */
     44     @NeededForTesting
     45     void ackMilestoneForTesting();
     46 
     47     /**
     48      * Method called from the test code to inform this executor that the tests are finished with all
     49      * milestones. Future calls to {@link #milestone()} or {@link #awaitMilestoneForTesting()}
     50      * should return immediately.
     51      */
     52     @NeededForTesting
     53     void ackAllMilestonesForTesting();
     54 
     55     /**
     56      * Method called from the test code to block until a milestone has been reached in the
     57      * production code.
     58      */
     59     @NeededForTesting
     60     void awaitMilestoneForTesting() throws InterruptedException;
     61 }
     62